Field Notes
<--2009-04-09 14:30:00 | 2009-04-14 14:00:00-->Other sites visited today: Sherman Island | Twitchell Rice
Phenocam link: Searching...
Sherman Island: 2009-04-09 14:30:00 (DOY 99)
Author: Joe Verfaillie
Others:
Summary: Light rain, fix computer screen power button, cal CNR1 still on tower, LGR mirrors need cleaning.
Sherman
4/9/2009 Arrived about 2:30pm after work at Twitchell. Light rain, overcast. Peperweed outside about 20 cm height, inside enclosure closer to waist high. Plastic power button on computer screen broken. Drilled new hole next to power button to access actual button on circuit board. Now use pen or pointed object to press and briefly hold button to turn on and off. Was going to swap CNR1 but new CNR1 was giving nearly identical readings and found one wire loose on old one. Decided to stay with old one until I can check data more closely and have a sunny day to have clearer readings. LGR status: 1.85 ppm 23.0 C 111.3 Torr 9.4 usec pump 6968 hours Seems like we need to bring in the LGR for cleaning and check exterior filters. Copied data – will put on Data PC. Most of the CR1000 data was missing since Feb 12th. Setting is Logger net were wrong. Data collection schedule turned off and data files going to default location not data folder. Fixed setting. Bees are gone. |
0 photos found
7 sets found
No data found for SI_mp.
10 SI_met graphs found
Can't check SI_mixed
2 SI_mixed graphs found
4 SI_flx graphs found
No data found for SI_soilco2.
Can't check TWSI_mixed
Can't check SIMBTWEE_met