|
|
Equipment and CalibrationView History
Equipment Entry
Instrument: | Soil Moisture Probe |
Manufacture: | Delta-T |
Model No: | ML2x |
Serial No: | 70/020 |
Tag No: | |
Acquisition Date: | 0000-00-00 |
Project: | NSF-Methane |
Location on 2013-12-06: | Lab, |
Notes: |
All but one tine had rotted off. I doubt this probe is fixable. |
|
|
Documents
No documents found
History
Rec No. | Date | Loc From | Title | Loc To | Notes |
1822 |
2013-12-06 |
Sherman Island |
Removed |
Lab none |
Removed from Sherman due to bad readings. The probe was buried at 23cm below the surface. All but one tine had rotted off. I doubt this probe is fixable. |
1751 |
2007-04-05 |
Lab none |
Installed |
Sherman Island Soil Moisture Probe B |
Installed by Ted at the Sherman cow pasture site at -30cm |
|
|
|