Equipment and Calibration History

History for Campbell Sci. RF401 35785

Rec No.DateLoc FromTitleLoc ToNotes
3916 2019-04-16 Lab none Installed Tonzi Install in the OSU SP1 box near the soil co2 system to connect the CR3000 to the Tower computer. Using Pakbus mode at 38400
3816 2018-12-19 Tonzi Removed Lab none Removed from the OSU SP1 system to test out data collection by LattePanda in the lab.
3671 2012-01-09 Lab none Installed Tonzi Installed in the Campbell Enclosure at SP1 inside the soil co2 fence. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.