Equipment and Calibration History

History for Campbell Sci. AM16/32 5609

Rec No.DateLoc FromTitleLoc ToNotes
5000 2020-12-01 Vaira Multiplexer Soil CO2 Removed Lab none The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed.
3322 2012-02-16 Lab none Installed Vaira Installed at Vaira with the new soil CO2 system. The system is not running yet because we need longer cables for the Vaisala co2 probes.