Equipment and Calibration History

History for Forerunner-Eosense eosFD 20160005

Rec No.DateLoc FromTitleLoc ToNotes
6266 2018-01-18 Factory none Disposed Disposed none Marked as disposed
5947 2018-01-17 Lab none Returned Factory none Sent by Fedex to Gregory Maurer (UCB) currently at UNM Albuquerque for Eosense.
3290 2018-01-15 Vaira Forced Diffusion West Removed Lab none Removed from near the West soil co2 profile for return to Eosense
3158 2017-10-18 Lab none Installed Vaira Forced Diffusion West Installed at Vaira near the West soil CO2 profile. The chamber is on a collar, fastened down with cable ties and power with 12V from a DC-DC power converter.