Equipment and Calibration History

History for Vaisala GMM222 L2010067

Rec No.DateLoc FromTitleLoc ToNotes
5007 2020-12-01 Vaira CO2 probe East Profile -0.04 Removed Lab none The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed.
3208 2017-11-29 Lab none Installed Vaira CO2 probe East Profile -0.04 Installed in the 4cm location in the East profile at Vaira to replace a probe with erratic values.