Equipment and Calibration History

History for Hukseflux HFP01 10822

Rec No.DateLoc FromTitleLoc ToNotes
3320 2018-01-31 Lab none Installed East End Heat Flux Plate B Installed at EE to right of rad boom in vegetation.
3175 2017-10-19 East End-Temp1 Heat Flux Plate B Removed Lab none Removed with decommissioning of East End Open Water tower (temporary tower 1)
2857 2017-06-01 Lab none Installed East End-Temp1 Heat Flux Plate B Installed at the East End Temporary Tower #1 Open Water location with the initial set up of this site.
2688 2017-04-04 Twitchell Rice Heat Flux Plate B Removed Lab none Removed with the decommissioning of the Twitchell Rice site.
1782 2015-04-09 Lab none Installed Twitchell Rice Heat Flux Plate B installed at rice as SHF2 in mux channel 17
1969 2014-10-22 Factory Calibration Factory Initial factory calibration:
a0 = 0
a1 = 62.51 uV/(W/m2)