Equipment and Calibration History

History for Kipp & Zonen PQS 1 110337

Rec No.DateLoc FromTitleLoc ToNotes
1709 2015-01-20 Lab none Installed East End PAR Sensor Reflected Reinstalled after being removed when the scaffolding fell over. This sensor is pointing down and measuring PARout.
1694 2015-01-05 East End PAR Sensor Incoming Removed Lab none Removed from the site due to the tower falling over in the wind on 2014-12-30. Likely undamaged.
1152 2013-11-25 DWR Corn PAR Sensor Outgoing Moved East End PAR Sensor Incoming This sensor was moved from the DWR Corn construction tower to the new East End tower and installed in the incoming position because the cable of the incoming PAR sensor was cut.
652 2012-06-21 Lab none Installed DWR Corn This sensor was installed in the downward facing position on a folding boom on the top northeast corner of the tower and extending to the east. It had a longer cable spliced on to it and replaced sn 110339.
4450 2011-11-18 Factory none Calibration Factory none Initial factory calibration 4.51uV/(umol/m2/s)