Equipment and Calibration History

History for Kyosera KD140SX-UFBS 11ZV0M0830

Rec No.DateLoc FromTitleLoc ToNotes
1158 2013-11-25 DWR Corn Solar Panel A Moved East End Solar Panel A The DWR Corn / Construction tower was decommissioned and rechristened at its new permanent location at the Twitchell East End Wetland
738 2012-05-21 Lab none Installed DWR Corn Installed on south side of the DWR Corn scaffolding with tri-groove and penta-plus bolts and nuts.