Rec No.DateLoc FromTitleLoc ToNotes
5176 2021-03-11 Lab none Installed Hill Slough Solar Panel C Installed at Hill Slough with site setup. This panel replaces panel sn 11ZV0M0836 which was removed because of damage when it fell over.
3098 2017-09-13 East End-Temp2 Solar Panel A Removed Lab none Removed from the East End Temporary Tower 2 - Closed Canopy location with the decommissioning of the site.
2872 2017-06-14 East End-Temp2 none Installed East End-Temp2 Solar Panel A Installed on the East End Temporary Tower #2 Closed Canpoy location with the initial tower set up.
4314 2017-06-01 Twitchell Rice 0 Removed East End-Temp2 none Removed from the Twitchell Rice tower location (the tower was removed previously) for use at the East End temporary towers. This panel was left at the Temp 2 (closed vegetation) site to be installed later.
577 2012-04-24 Lab none Installed Twitchell Rice Installed to power the site. The solar panels are on the the wooden base to the north of the box. Old panels are disconnected