Equipment and Calibration

View History

Equipment Entry

Instrument:Battery Bank
Manufacture:Fabricated
Model No:BB-Fab
Serial No:BB-BA-edge
Tag No:
Acquisition Date:2022-04-25
Project:Carlos
Location on 2022-12-05:Bouldin Alfalfa,
Notes: Two brand new grp27 deep cycle marine Duracell 90Ahr SLI27MDC with with 04/22 tags

Documents

No documents found

History

Rec No.DateLoc FromTitleLoc ToNotes
6121 2022-11-02 Bouldin Alfalfa-ADEX Battery Bank Edge Removed Lab none Removed with decommissioning of advection edge tower and brought back to the lab. This battery bank will cease to exist and these new-ish batteries will be moved to Hill Slough to replace old batteries there.
6120 2022-04-25 Lab none Installed Bouldin Alfalfa-ADEX Battery Bank Edge Two brand-new deep cycle flooded batteries installed to power the advection edge tower