Equipment and Calibration
View History
Equipment Entry
|
Documents
No documents found
History
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
5818 | 2021-11-05 | Bouldin Alfalfa-ADEX Solar Panel Bouncer A | Removed | Lab none | Removed from BA bouncer tower at the conclusion of this summer's advection setup. |
5817 | 2021-07-20 | Lab none | Installed | Bouldin Alfalfa-ADEX Solar Panel Bouncer A | Installed at the Bouncer tower for the advection experiment |
5816 | 2010-08-19 | Tonzi none | Removed | Lab none | Removed from the Tram charging station so that two 20W panels could be use for a 24V system. |