Equipment and Calibration History

History for Vaisala HMP45AC D4420028

Rec No.DateLoc FromTitleLoc ToNotes
6492 2023-12-22 Lab none Installed Mayberry RH & Temp Installed at MB to replace HMP155 that died and was removed last visit. HMP155 cable removed this time. Met program updated for different AirT offset.
6484 2023-12-13 Lab none Tested Lab none Plugged in for a few minutes in a lab and still compares fine with the cal kit HMP155. We will use this sensor Mayberry to replace the dead HMP155 sn T2820180.
6113 2022-11-30 Bouldin Alfalfa-ADEX RH & Temp Edge Upper Removed Lab none Removed from the main tower and brought back to the lab at the end of the ADEX intercomparison
5848 2022-04-25 Lab none Installed Bouldin Alfalfa-ADEX RH & Temp Edge Upper Installed on top of the Edge tower at 3.96m alg for the advection experiment at BA