Equipment and Calibration
View History
Equipment Entry
|
Documents
No documents found
History
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6111 | 2022-11-30 | Bouldin Alfalfa-ADEX RH & Temp Edge Lower | Removed | Lab none | Removed from the main tower and brought back to the lab at the end of the ADEX intercomparison |
5849 | 2022-04-25 | Lab none | Installed | Bouldin Alfalfa-ADEX RH & Temp Egde Lower | Installed on the main post at the Edge tower at 2.42m alg for the advection experiment at BA |