Equipment and Calibration
View History
Equipment Entry
|
Documents
No documents found
History
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6514 | 2024-01-04 | Bouldin Corn Solar Controller Surface Renewal | Removed | Lab none | Removed from BC at the conclusion of Corteva's IRT experiment. |
5335 | 2021-06-16 | Lab none | Installed | Bouldin Corn Solar Controller Surface Renewal | Installed as part of Kevin Tu's surface renewal experiment but not being used due to concerns about pulling too much power. |