Equipment and Calibration
View History
Equipment Entry
|
Documents
PackingSlip: ps_Campbell_20120312.pdfReport: Water Level sensor calibration with staff gauge - 2018-04-24
History
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6516 | 2024-01-04 | Bouldin Corn Infrared Temperature South | Removed | Lab none | Removed from BC at the conclusion of Corteva's IRT experiment. |
5333 | 2021-06-16 | Lab none | Installed | Bouldin Corn Infrared Temperature South | Installed as part of Kevin Tu's surface renewal experiment |