5136 2021-02-26 Sherman Wetland-Temp1 Battery Bank Disposed Disposed none Removed from the decommissioned temporary location. The batteries were brought back to the lab and will be used at Hill Slough but this battery bank has ceased to exist as an equipment entry
4739 2020-09-10 Sherman Wetland-Temp1 Battery Bank Maintenance Sherman Wetland-Temp1 Battery Bank Due to sporadic power loss these batteries were inspected. They all were low on water with plates exposed. About a half gallon of DI water was added to each battery.
4402 2020-01-20 East Pond Battery Bank Installed Sherman Wetland-Temp1 Battery Bank Installed with the initial setup up of the tower. Parts last used at the East Pond site. Five size 31 Duracell deep cycle batteries (July 2018 tags). These are part number SLI31MDC and have a capacity of 105Ah. 12VDC system.