Equipment and Calibration History

History for Arable Mark II C002445

Rec No.DateLoc FromTitleLoc ToNotes
5127 2020-04-23 Lab none Disposed Disposed none Returned to Arable
4199 2019-12-02 Bouldin Corn Weather Station C Removed Lab none Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26.
4184 2019-05-23 Lab none Installed Bouldin Corn Weather Station C Installed on a new boom fixed to the southwest corner of the scaffolding for inter-comparison with existing Mark I unit and our tower data. The Mark I unit was also moved to the new boom.