Equipment and Calibration History
History for Campbell Sci. AM16/32 5609
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
5000 | 2020-12-01 | Vaira Multiplexer Soil CO2 | Removed | Lab none | The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed. |
3322 | 2012-02-16 | Lab none | Installed | Vaira | Installed at Vaira with the new soil CO2 system. The system is not running yet because we need longer cables for the Vaisala co2 probes. |