Instrument:Battery Bank
Manufacture:Fabricated
Model No:BB-Fab
Serial No:BB-VR
Tag No:NULL
Acquisition Date:0000-00-00
Project:NULL
Location on 2022-05-10:Vaira, NULL
Notes: Battery bank for Vaira site.

Documents

No documents found

History

Rec No.DateLoc FromTitleLoc ToNotes
5832 2022-05-10 Vaira Battery Bank Main Maintenance Vaira Battery Bank Main Fixed broken wire between the two banks of solar panels. Disconnected and load tested all the batteries. Two batteries, second from north in each box, tested bad. These were moved to the north most position and left disconnected. The other six tested good and were reconnected.
2333 2005-12-13 Vaira Upgrade Vaira Six old gel cell batteries were removed and will be added to Tonzi Tower. Eight new gel cell batteries installed. The new batteries are Maxrate Premium Plus MT12-350. Valve regulated lead acid battery 12v 93 ah @ 20 hr rate. Bought from Nor-Cal Battery for 5 ea.
4929 2003-12-19 Vaira Battery Bank Main Upgrade Vaira Battery Bank Main Cleaned battery terminals and added four batteries from the Floor site for a total of 12 at Vaira.
4896 2003-02-13 Vaira Battery Bank Main Upgrade Vaira Battery Bank Main Added four batteries removed from Tonzi-Tower. Now a total of eight batteries.