Equipment and Calibration History

View Equipment |

View history entry 5832 for Fabricated BB-Fab sn: BB-VR

Date: 2022-05-10
From: Vaira - Battery Bank Main
To: Vaira - Battery Bank Main
Title: Maintenance
Notes: Fixed broken wire between the two banks of solar panels. Disconnected and load tested all the batteries. Two batteries, second from north in each box, tested bad. These were moved to the north most position and left disconnected. The other six tested good and were reconnected.
Entered by: Joe Verfaillie
Field notes