Equipment and Calibration History
History for Campbell Sci. CS655 17127
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6966 | 2024-10-24 | Lab none | Installed | Bouldin Alfalfa Soil Moisture Probe A | Installed in the field after wheat was planted |
6907 | 2024-10-09 | Bouldin Alfalfa Soil Moisture Probe A | Removed | Lab none | Removed from BA tower and brought back to the lab. The BA field is getting plowed. |
2402 | 2016-08-12 | Lab none | Installed | Bouldin Alfalfa Soil Moisture Probe A | Installed with the initial set up of the site. |