Rec No. | Date | Loc From | Title | Loc To | Notes |
6967 |
2024-10-24 |
Lab none |
Installed |
Bouldin Alfalfa Heat Flux Plate A |
Installed in the field after wheat was planted |
6908 |
2024-10-09 |
Bouldin Alfalfa Heat Flux Plate A |
Removed |
Lab none |
Removed from BA tower and brought back to the lab. The BA field is getting plowed. |
2409 |
2016-08-12 |
Lab none |
Installed |
Bouldin Alfalfa Heat Flux Plate A |
Installed with the initial set up of the site. |
1953 |
2014-11-10 |
Factory |
Calibration |
Factory |
Initial factory calibration: 62.90 uV/(W/m2) |