Equipment and Calibration History
History for Hukseflux HFP01 10866
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6967 | 2024-10-24 | Lab none | Installed | Bouldin Alfalfa Heat Flux Plate A | Installed in the field after wheat was planted |
6908 | 2024-10-09 | Bouldin Alfalfa Heat Flux Plate A | Removed | Lab none | Removed from BA tower and brought back to the lab. The BA field is getting plowed. |
2409 | 2016-08-12 | Lab none | Installed | Bouldin Alfalfa Heat Flux Plate A | Installed with the initial set up of the site. |
1953 | 2014-11-10 | Factory | Calibration | Factory | Initial factory calibration: 62.90 uV/(W/m2) |