Equipment and Calibration History
History for Delta-T BF5 25/03
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
971 | 2013-04-10 | Lab none | Installed | Tonzi-Tower | Installed on the radiation boom at the tower top and connected to the AM16/32 on the tower top CR23X |