Equipment and Calibration History

View Equipment |

View history entry 971 for Delta-T BF5 sn: 25/03

Date: 2013-04-10
From: Lab - none
To: Tonzi-Tower -
Title: Installed
Notes: Installed on the radiation boom at the tower top and connected to the AM16/32 on the tower top CR23X
Entered by: