Equipment and Calibration History
History for Vaisala GMP221 H1310008
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
1280 | 2014-04-08 | Lab none | Disposed | Disposed | Tested bad in the lab. Considerable corrosion on the outside of the cell. |
1228 | 2014-02-25 | West Pond CO2 probe A | Removed | Lab none | Removed from West Pond due to bad readings. Initial inspection in the field revealed the probe to be wet inside the Teflon sock. The black plastic dip sealing the top of the sock may have leaked. There was black residue inside the sock. Test in the lab before list as dead. |
908 | 2013-01-17 | Lab none | Installed | West Pond CO2 probe A | Installed in a teflon sock in the water near the other water sensors |
1421 | 2013-01-08 | Lab none | Calibration | Lab none | Trueppm = Probeppm*0.9955 + -27.3; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 421ppm, 3056ppm, and 10000ppm. Ta=22.3C, P=102.5kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Sara. |