Equipment and Calibration History
History for MorningStar PS-30M 11400073
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
1160 | 2013-11-25 | DWR Corn Solar Controller | Moved | East End Solar Controller | The DWR Corn / Construction tower was decommissioned and rechristened at its new permanent location at the Twitchell East End Wetland |
739 | 2012-05-21 | Lab none | Installed | DWR Corn | Installed in a small enclosure on south side of the DWR Corn scaffolding. Connected to two solar panels and four deep cycle baterries. |