Rec No. | Date | Loc From | Title | Loc To | Notes |
3303 |
2018-01-23 |
Lab none |
Installed |
Mayberry |
Installed at Mayberry to supply extra winter power. |
3177 |
2017-10-19 |
East End-Temp1 Solar Panel A |
Removed |
Lab none |
Removed with decommissioning of East End Open Water tower (temporary tower 1) |
2859 |
2017-06-01 |
Twitchell Rice 0 |
Moved |
East End-Temp1 Solar Panel A |
Installed at the East End Temporary Tower #1 Open Water location with the initial set up of this site. |
579 |
2012-04-24 |
Lab none |
Installed |
Twitchell Rice |
Installed to power the site. The solar panels are on the the wooden base to the north of the box. Old panels are disconnected |