Equipment and Calibration History

History for Kyosera KD140SX-UFBS 11ZV0M0835

Rec No.DateLoc FromTitleLoc ToNotes
3303 2018-01-23 Lab none Installed Mayberry Installed at Mayberry to supply extra winter power.
3177 2017-10-19 East End-Temp1 Solar Panel A Removed Lab none Removed with decommissioning of East End Open Water tower (temporary tower 1)
2859 2017-06-01 Twitchell Rice 0 Moved East End-Temp1 Solar Panel A Installed at the East End Temporary Tower #1 Open Water location with the initial set up of this site.
579 2012-04-24 Lab none Installed Twitchell Rice Installed to power the site. The solar panels are on the the wooden base to the north of the box. Old panels are disconnected