Equipment and Calibration History
History for Kyosera KD140SX-UFBS 11ZV0M0828
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
5176 | 2021-03-11 | Lab none | Installed | Hill Slough Solar Panel C | Installed at Hill Slough with site setup. This panel replaces panel sn 11ZV0M0836 which was removed because of damage when it fell over. |
3098 | 2017-09-13 | East End-Temp2 Solar Panel A | Removed | Lab none | Removed from the East End Temporary Tower 2 - Closed Canopy location with the decommissioning of the site. |
2872 | 2017-06-14 | East End-Temp2 none | Installed | East End-Temp2 Solar Panel A | Installed on the East End Temporary Tower #2 Closed Canpoy location with the initial tower set up. |
4314 | 2017-06-01 | Twitchell Rice 0 | Removed | East End-Temp2 none | Removed from the Twitchell Rice tower location (the tower was removed previously) for use at the East End temporary towers. This panel was left at the Temp 2 (closed vegetation) site to be installed later. |
577 | 2012-04-24 | Lab none | Installed | Twitchell Rice | Installed to power the site. The solar panels are on the the wooden base to the north of the box. Old panels are disconnected |