History for Campbell Sci. CR10X 20138
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6885 | 2024-09-16 | Lab none | Tested | Lab none | Tested in the lab for possible use at GT. OS 22 updated to 23, internal battery was 2.89V, clock was 2020. Wiring panel is 36418. |
3844 | 2019-01-13 | Lab none | Installed | Tonzi | Installed near the Floor solar panels to record temperatures from a concrete cal panel for the FLIR thermal camera. |
3376 | 2018-03-06 | Tonzi | Removed | Lab none | Removed from Tonzi tower's old CO2 profile system b/c the profile system was not working. It was replaced by sn 47253. |