Field Notes
<--2002-04-04 10:00:00 | 2002-04-11 09:30:00-->Other sites visited today: Tonzi/Vaira
Phenocam link: Searching...
Vaira: 2002-04-04 14:31:00 (DOY 94)
Author: Ted Hehn
Others: Dennis
Summary: Install bird spikes, bond batteries, remove fence, install height extension.
08:00 Vaira ranch – overcast & cool. All appears well – Regulator: V=12.0 LED Status= Yellow AC=1.8 LC= 2.7 Tonzi floor— Overcast & cool Hehn, Baldocchi and Baldocchi arrive Regulator: V=12.6 LED status= ? AC=4.1 LC= 2.5 Install anti-bird devices at floor system: sonic & IRGA Bond floor flux system batteries to earth ground Bond tower flux system batteries to earth ground. Remove orange iron fence from met-station near tower and clean up entire research area. Install height extension and pivot on tower IRGA. |
Field Data
No tank data
No VR Well data found
No TZ Moisture Point data found
No VR Moisture Point data found
No TZ grass heigth found
No VR grass heigth found
No VR Tree DBH found
No water potential data found
No VR Grass Biomass data found
No VR OakLeaves Biomass data found
No VR PineNeedles Biomass data found
0 photos found
9 sets found
16 VR_met graphs found
No data found for VR_flux.
No data found for VR_soilco2.
No data found for VR_pond.
Can't check TZVR_mixed
No data found for VR_fd.
No data found for VR_processed.
No data found for VR_arable.
No data found for VR_soilvue.