Field Notes
<--2007-06-27 00:00:00 | 2007-07-17 00:00:00-->Phenocam link: Searching...
Tonzi: 2007-07-09 00:00:00 (DOY 190)
Author: Ted Hehn
Others:
Trip Purpose General site visit
Tonzi Ranch: Radiation railroad in charging dock and motor running and gears stripped. Install secondary direct drive chassis. Unit begins operation. Tower: remove LI 7500 #35 and install # 976 CO2 profile pump failure – tap on unit and it begins operation. |
Field Data
No tank data
No TZ Well data found
No TZ Moisture Point data found
No VR Moisture Point data found
No TZ grass heigth found
No VR grass heigth found
No TZ Tree DBH found
No water potential data found
No TZ Grass Biomass data found
No TZ OakLeaves Biomass data found
No TZ PineNeedles Biomass data found
0 photos found
16 sets found
No data found for TZ_Fenergy.
11 TZ_tmet graphs found
No data found for TZ_soilco2.
Can't check TZ_mixed
3 TZ_mixed graphs found
No data found for TZ_fflux.
8 TZ_fmet graphs found
No data found for TZ_tram.
3 TZ_co2prof graphs found
No data found for TZ_irt.
1 TZ_windprof graphs found
No data found for TZ_tflux.
2 TZ_sm graphs found
Can't check TZ_met
1 TZ_met graphs found
Can't check TZVR_mixed
No data found for TZ_osu.
No data found for TZ_fd.
Tonzi Z-cam data