Equipment and CalibrationView History
Equipment Entry
Instrument: | PAR Sensor |
Manufacture: | Kipp & Zonen |
Model No: | PAR-LITE |
Serial No: | 990017 |
Tag No: | |
Acquisition Date: | 1999-02-09 |
Project: | DOE-TCP |
Location on 2017-08-25: | , 23m |
Notes: |
Facing up measuring incoming PAR. Initial factory calibration 5.16 uV/(umol/m2/s) |
|
|
Documents
Calibration: cal_KippZonen_PARLite_sn990017_19990209.pdf
History
Rec No. | Date | Loc From | Title | Loc To | Notes |
3003 |
2017-08-25 |
none |
Notes |
none |
Removed incoming PAR-Lite from Tonzi tower. It was sn 010159. Not sure where PAR-Lite sn 990017. |
3687 |
2001-05-20 |
Lab none |
Installed |
Tonzi |
Installed on the Tower top in the reflected PAR location with the initial set up of the site |
5117 |
1999-02-09 |
Factory none |
Calibration |
Factory none |
Initial factory calibration: 5.16uV/(umol/m2/s) |
|
|
|