Equipment and Calibration History

History for Delta-T ML3 M003369

Rec No.DateLoc FromTitleLoc ToNotes
2400 2016-08-12 Lab none Installed Bouldin Alfalfa Soil Moisture Probe Theta Installed with the initial set up of the site.