Equipment and Calibration History

History for Campbell Sci. CR10X 12213

Rec No.DateLoc FromTitleLoc ToNotes
1621 2014-10-09 Mayberry-Portable Removed Lab none Removed with the rest of the portable tower equipment. End of the portable tower campaign.
1610 2013-01-06 Tonzi Removed Lab none Removed from the non-functional east sap flow station at Tonzi.