Equipment and Calibration History

History for Arable Mark II C011018

Rec No.DateLoc FromTitleLoc ToNotes
6405 2023-09-12 Bouldin Alfalfa Weather Station PL_S-B Removed Lab none Removed with post and ground anchor since the PL-Arable project is currently paused according to PL. This unit had one red status light (bad sensors?) when I shut it down.
5766 2022-03-31 Lab none Installed Bouldin Alfalfa Weather Station PL_S-B Installed at Bouldin Alfalfa to replace sn C003947.