Equipment and Calibration

View History

Equipment Entry

Instrument:Solar Controller
Manufacture:Campbell Sci.
Model No:CH150
Serial No:1688
Tag No:
Acquisition Date:2011-06-11
Project:IRT Surface Renewal
Location on 2024-01-04:Lab,
Notes: Received from Tu, Kevin for an experiment on Infrared Surface Temperature based surface renewal at BA and BC.

Documents

No documents found

History

Rec No.DateLoc FromTitleLoc ToNotes
6508 2024-01-04 Bouldin Alfalfa Solar Controller Surface Renewal Removed Lab none Removed from BA tower at the conclusion of Corteva's IRT experiment.
5343 2021-06-16 Lab none Installed Bouldin Alfalfa Solar Controller Surface Renewal Installed as part of Kevin Tu's surface renewal experiment