Equipment and Calibration History

History for Campbell Sci. CH150 1688

Rec No.DateLoc FromTitleLoc ToNotes
6508 2024-01-04 Bouldin Alfalfa Solar Controller Surface Renewal Removed Lab none Removed from BA tower at the conclusion of Corteva's IRT experiment.
5343 2021-06-16 Lab none Installed Bouldin Alfalfa Solar Controller Surface Renewal Installed as part of Kevin Tu's surface renewal experiment