Equipment and Calibration History
History for MorningStar PS-30M 0127000A
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
4616 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
4586 | 2020-07-09 | Lab none | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
4552 | 2020-07-07 | Tonzi none | Removed | Lab none | Removed from the Floor solar system. I needed a 30A model for the tower going to Steve and Sabina. Since updating this system 24V the amp load has decreased below 15A. Replaced by sn 12501584. |