5701 | 2022-02-18 | Lab none | Installed | Gilbert Tract Solar Panel ADCP | Installed near the Gilbert Tract breach to measure tidal current |
5691 | 2022-02-09 | Tonzi | Removed | Lab none | Removed from OSU SP2 with the dying battery. Replaced with a power line from the Tower battery bank. |
3652 | 2012-01-09 | Lab none | Installed | Tonzi | Installed at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. |