Equipment and Calibration History

History for KNF Neuberger UN86 KNDC 1/1166012

Rec No.DateLoc FromTitleLoc ToNotes
66 2010-02-10 Tonzi-Tower Removed Lab none This pump was spare in the CO2 profile box at Tonzi. It had the wrong connectors on its wires and it was decided not to run the CO2 profile system to conserve power. So this pump was returned to the lab to correct the connectors.