Equipment and Calibration History
View Equipment |
Date: |
2024-10-17 |
From: |
Hill Slough - Conductivity Sensor |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed from the Hill Slough channel and brought back to the lab for routine calibration |
Entered by: |
Daphne Szutu |
|
|
Field notes