Equipment and Calibration History
View Equipment |
Date: |
2024-05-15 |
From: |
Tonzi - Battery Bank soil co2 |
To: |
Tonzi - Battery Bank soil co2 |
Title: |
Upgrade |
Notes: |
I replaced the three flooded batteries in the Soil CO2 battery bank with two new SLA group 27 batteries. The cows had chewed up all the wiring. I replaced all the wires. Now only the two larger 40W panels are connect resulting in about 4.5A. The charge controller is only 6A. The new power line runs to the OSU SP1 box. |
Entered by: |
Joe Verfaillie |
|
|
Field notes