Equipment and Calibration History
View Equipment |
Date: |
2024-04-10 |
From: |
Lab - none |
To: |
Hill Slough - Conductivity Sensor |
Title: |
Installed |
Notes: |
Reinstalled at the HS channel after regular lab cleaning and calibration |
Entered by: |
Joe Verfaillie |
|
|
Field notes