Equipment and Calibration History
History for Delta-T ML2x 70/002
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
1940 | 2015-09-09 | Lab none | Disposed | Disposed | All but the center tine have rotted away. Deposited in the dead sensor box for parts. |
1843 | 2015-05-12 | Sherman Island | Removed | Lab none | Removed with the decommissioning of the Sherman Cow Pasture site. All but one of the times are rotted off. |
2085 | 2014-04-10 | Sherman Island | Location | Sherman Island | First probe on data logger, notes claim it is at -20cm |
1750 | 2007-04-04 | Lab none | Installed | Sherman Island Soil Moisture Probe A | Installed by Ted at the Sherman cow pasture site at -20cm |