Equipment and Calibration History
View Equipment |
Date: |
2022-08-25 |
From: |
Tonzi - Battery Bank soil co2 |
To: |
Tonzi - Battery Bank soil co2 |
Title: |
Maintenance |
Notes: |
This battery bank had been without batteries since its batteries were moved to the Tower a few weeks ago. I installed three old batteries from the Floor system that tested ok with the load tester. I rewired the two larger solar panels to 12V. The two smaller panels had there leads chewed and I left them disconnected for now. |
Entered by: |
Joe Verfaillie |
|
|
Field notes