Equipment and Calibration History

View Equipment |

View history entry 5944 for Fabricated BB-Fab sn: BB-TZ_soilco2

Date: 2022-08-05
From: Tonzi - Battery Bank soil co2
To: Tonzi - Battery Bank soil co2
Title: Maintenance
Notes: The batteried in this bank have been temporarily removed to power the Tower. Likely this bank will be repopulated to power the OSU-SP1 system and a couple FD chambers as the Vaisala soil CO2 system is decommissioned.
Entered by: Joe Verfaillie
Field notes