Equipment and Calibration History

History for Kipp & Zonen PQS 1 140450

Rec No.DateLoc FromTitleLoc ToNotes
5502 2021-09-02 Sherman Wetland PAR Sensor Reflected Moved Gilbert Tract PAR Sensor Reflected Moved from SW to GT with the decomissioning of SW and the beginning of GT
2303 2016-05-24 Lab none Installed Sherman Wetland PAR Sensor Reflected Installed on the Sherman Wetland tower at the initial set up of the site. It is in the reflected posistion.
1982 2014-09-09 Factory Calibration Factory Initial factory calibration: 8.10 uV/(umol/m2/s), 470 Ohm